Job accomplished at Unit 3, Weir Retail Park, Benfleet, spanning an impressive 10,883 square feet and completed within a swift 6-week timeframe. External improvements involved meticulous roof cleaning, with an additional provision for lining gutters using the HD Sharman Delcote GS system. External elevations received a fresh coat of paint, columns to canopy were redecorated, and all cladding was thoroughly cleaned. Signage was removed, and roller shutter services were attended to. Internally, significant modifications included the removal of the lift and installed mezzanine, as well as the dismantling of ground floor partitioning to create an open-plan layout. HVAC systems were isolated and removed, paving the way for the design and installation of new LED lighting fixtures throughout the unit.